Glossary: PostgreSQL Beyond the Basics
Cost (startup cost, total cost)
Also written: cost, startup cost, total cost
The planner's own estimate of work, shown as `cost=0.29..8.30`. The first number is the cost before the first row comes out, and the second is the cost to return all rows. It is not in milliseconds.